Monday: plumbing and counters selected today. Oh, and there's a bathtub in the bedroom, a water heater in the basement, and white pipes in stacks everywhere.
Tuesday: present at 7:45 this morning: Dan and John, Ed the Electrician, Davy Jones plumbers, roofers, insulation guys. While hammering and stapling and sawing screamed and pounded through the house, we calmly, carefully thought out which lights to switch where, how many cans to place in the great room, which rooms to run cable through, whether to place sconces or over-mirror lighting in bathrooms, where to position the outlets and jacks, and more. By the end of the day, blue boxes dotted the studs upstairs and down:
Wednesday: All the windows except Lena's bedroom have been installed. Dan designed bathroom vanities on the fly. All cabinets must be designed, with specs passed along to the Amish cabinet builder, by the end of the week.
Thursday: Those white pipes now weave through the walls:
Friday: Lena and I spent two hours with the lighting designer. We're both so burnt out we've decided to do flashlights and call it good. The windows all came today. And we built a mock bench out of cardboard to get a sense of the fit and proportions in the tight mud area (a mud area, not a mudroom, but we're no less thrilled to have it). When we put it in place, we realized it's a good thing we aren't the ones building the house... "Leave the carpentry to the carpenters," said Mary.

Next post: the roof!
Next week: the siding!